유출저감용 저류지 설계를 위한 간이기법 개발
A Development of Simplified Method for the Detention Pond Design with Runoff Reduction
- 한국방재학회
- 3. 한국방재학회 학술대회논문집
- 2007년
-
2007.02632 - 635 (4 pages)
- 0
Detention pond has an important role in peak flow reduction to mitigate flood damage. Design of detention pond is accomplished through the preliminary stage, planning stage, and design stage in general. New development projects produce increased peak flow and flow amounts. In this case it is necessary to design the detention pond easily and simply. The simple procedure of detention pond design is proposed in this study. The relevant variables are peak flow ratio (<TEX>$\alpha$</TEX>) for the before and after development, and storage ratio which is ratio of storage volume to flow amounts. Simplified method for the detention pond design with runoff reduction is easily used for practical purposes.
(0)
(0)