대구순환고속도로 제5공구 BIM 시범설계의 신뢰성분석 및 제언
Analysis of Reliability and Suggestion on BIM design at Daegu Expressway Lot No.5
- 한국BIM학회
- KIBIM Magazine
- 4권 4호
-
2014.121 - 12 (12 pages)
- 50

As interest for visualization and real time processing of construction management information was heightened recently, a diversity of management tools have been developed and corresponding systems also have been changed. In the case of BIM(Building Information Modeling) which is being spotlighted as such kind of management tool, its outcome such as technical innovation and time saving through overseas success case, reducing effect of unnecessary work, and so forth has continuously been established. The BIM in which various information related with life cycle of project are managed with the base of 3D object is useful as an information management tool of construction project which becomes complex and large in its scale. The aim of this paper is analysis or reliability on BIM design for expressway. To solve these issues, this study analyzes the design document, road design handbook, guide. Also this paper performed analysis of reliability 2D vs. BIM quantity calculation. This pilot projects "BIM design at Daegu expressway Lot No.5" lays the foundation for future work on BIM based civil engineering design.
ABSTRACT
1. 서론
2. 고속도로 설계 BIM기반 물량산출
3. 고속도로 설계 공종별 물량산출 신뢰성 분석
4. 결론 및 제언
References
(0)
(0)