시공현장 BIM 운영 및 성과측정을 위한 사례분석
A Case Study on BIM Operating and Performance Measurement in Construction Phase
- 한국BIM학회
- KIBIM Magazine
- 5권 2호
-
2015.061 - 11 (11 pages)
- 119

???撮??撮?
Despite a lot of research on BIM, there is no quantitative study to measure accurately the performance of BIM coordination service. Thus, this study suggested method to measure the performace of BIM coordination services, applying queueing models in the field of management science. To analyze queuing system of BIM coordination services, a group of BIM coordinator were selected. Through focus group interviews with experts were used in the analysis to derive mean arrival rate, mean service rate of BIM coordination services. Single-server queuing model, multiple server queuing model is utilized for the BIM coordination services performance measurement in construction phase. This study has significant quantitative performance measurement approaches that can be utilized in the decision-making for the improvement of the BIM coordination services and to support the review of the alternatives accordingly. But There is a limit but it is difficult to take into account the increase or decrease of the cost of alternatives according to the review.
ABSTRACT
1. 서론
2. 이론적 고찰
3. 대기행렬모형 제안
4. 대기행렬모형의 성과측정
5. 사례 분석
6. 향후 연구 진행 방향 및 결론
References
(0)
(0)