FMEA 기법을 이용한 설계시공일괄방식 주요 클레임 요인 도출

Identification of Claim Elements for Design Build Projects using FMEA Method

  • 37
125404.jpg

Design-build projects were devised to enhance the design technologies of the domestic construction industry and the efficiency of public works, contributing greatly to the development of construction technologies. However, as various stages of the process, such as formulation of basic plans and design documents, and deliberations proceed, claims, including changes in the requirements of clients, and design changes occur. These claims result in the delay in construction and an increase in construction costs. In this regard, this study attempted to identify main claims that delay construction and increase the costs of design-build projects, prevent claims in the future, and improve the efficiency of project implementation.

ABSTRACT

1. 서론

2. 이론적 고찰

3. 설계시공일괄방식의 잠재적 클레임요인 분석

4. FMEA기법을 이용한 주요클레임 요인 도출

5. 주요클레임 요인의 타당성검증

6. 결론

References

(0)

(0)

로딩중