This paper describes an investigation to determine whether the activated sludge (AS) process could be used for the treatment of wastewater at the Union Carbide Coporation (UCC) plant in Seadrift, Texas. This plant presently utilizes a waste stabilization pond (WSP) system for treatment of the wastewater. The treatment system consists of an in-plant primary WSP and two off-plant WSPs (secondary and tertiary WSPs), run in series. The total hydraulic detention time of the WSP system is approximately 150 days. Several laboratory-based treatability studies have been conducted to evaluate the performace of the WSP system and the degradability of specific chemical compounds. From an additional study, it was determined that the WSP system was stressed and occasionally operating near the limit of its treatment capacity. The existing primary WSP plays an important role in the overall treatmemt system, because it not only functions as a pH and organic-strength equalization basin, but also serves as a