핀-관 열 교환기의 핫가스 제상장치에 의한 최적제상시간에 관한 실험적 연구
An Experimental Study on the Time of Optimum Defrost of Hot-Gas Defrost Equipment by the Fin-Tube Heat Exchanger
- 한국산업기술융합학회(구. 산업기술교육훈련학회)
- 산업기술연구논문지
- 산업기술교육훈련논문지 제16권 4호
-
2011.1275 - 81 (7 pages)
- 16
In the Freezing. I studied a defrosting method more efficient to remove a frost floor generated to a vaporizer in cold storage. I Study to the evapolator which used Hot-Gas Defrost Equipment, and I was more efficient, and I endeavored in order to prevent loss of an unnecessary energy. I have tired among various defrosting methods in this study as I applied a Hot-Gas Defrost Equipment defrosting method for knowing the necessary most suitable a period of defrosting to remove perfectly frost conceived to a Fin-tube Heat Exchanger, and I measured a change of temperature and pressure a defrosting in time by real time.
1. 서 론
2. 실험장치 및 방법
3. 실험결과 및 고찰
4. 결 론
(0)
(0)