제약 만족 기법을 이용한 조선 산업에서의 탑재 일정 생성에 관한 연구
A study on the erection scheduling in the shipbuilding using constraint satisfaction technique
- 강원대학교 산업기술연구소
- 산업기술연구
- vol.19
-
1999.091 - 9 (9 pages)
- 6
The dock is the most important resource in shipbuilding yard. Among the shipbuilding schedules, the ship erection schedule in a dock is preferentially built. As results of it, the other schedules(machining in plants, block assembly, pre-painting, pre-rigging, painting and etc) are made. In this study, ship erection scheduling is formulated using ILOG Scheduler. This study is to develop a new problem solving method for ship erection to make an effective schedule based on Constraint Satisfaction Technique(CST).