138397.jpg

In The case of the bridge which is located in the downstream of the dam, effect of the running water and stability of the bridge is studing by using the Hydraulic model test. 1. The water level change of ‘Seosang1 bridge’ along Chunchon dam spill occurred through this experiment more greatly than a numerical conspiracy. 2. Bight is the spot where a difference occurs in located bridge piers(p18-p28) greatly, and an influence of Chunchon dam occurs in greatly.