상세검색
최근 검색어 전체 삭제
다국어입력
즐겨찾기0
학술저널

Surface 및 Solid 방식의 비교를 통한 Parametric 기법의 토공물량산출 방법

Parametric Quantity Take-Off of Earthwork by Comparing the Use of Surface and Solid Models

  • 26
139523.jpg

There exists no precedented case of quantity take-off, using parametric modeling, from BIM-based irregular structures. Civil 3D provides earthwork quantity take-off based on surface modeling. Generally, designers should enter data into the specification additionally after extracting quantity estimation from earthwork modeling design. The objective of this report is to suggest the method from quantity take-off to specification of BIM-based earthwork quantities. We intend to investigate earthwork take-off method by Civil3D and explain why parametric information extraction is required for quantity estimation and specification and how information of earthwork quantity based on solid and surface modeling is connected to open quantity take-off module. It is highly expected that this suggestion would be the practical methodology of earthwork quantity take-off and specification in the field of civil engineering.

ABSTRACT

1. 서론

2. 도로선형 설계에 의한 비정형 토공 물량산출방법에 대한 고찰

3. 3차원 BIM기반 Parametric기법의 토목공사 비정형 토공 물량산출 방법론 제안

4. 향후 연구 진행 방향 및 결론

References

(0)

(0)

로딩중