시뮬레이션 기반의 잉곳 제조 공정 스케쥴링
Simulation based scheduling in Ingot Manufacturing Process
- 한국시뮬레이션학회
- 한국시뮬레이션학회 학술대회집
- 2014년 추계학술대회 발표집
-
2014.1139 - 41 (3 pages)
- 20

Presented in this paper is a release policy to achieve the on-time delivery for an ingot manufacturing process including ingot growing. An ingot is the first manufactured material of wafers. In ingot fabrication;the processing steps takes as long as 2 days as compared to 10 hours for processing steps in wafer FAB. A Release policy is critical to achieve the on-time delivery;because ingot manufacturing process contains less steps and has long processing times for each step. We developed a simulation model;and conducted experimentations with MOZART. The experimentation results show that the proposed release policy can achieve the on-time delivery in an ingot manufacturing process including ingot growing.
1. 서론
2. 시뮬레이션을 이용한 스케쥴링 방식
3. 결론
(0)
(0)