상세검색
최근 검색어 전체 삭제
다국어입력
즐겨찾기0
162523.jpg
KCI등재 학술저널

공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석

Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding

DOI : 10.32599/apjb.13.1.202203.213
  • 25

Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

Ⅰ. 서론

Ⅱ. 공공공사 기술형 입찰방식에 대한 고찰 및 선행연구

Ⅲ. 연구방법론

Ⅳ. 실증분석

Ⅴ. 결론

로딩중