상세검색
최근 검색어 전체 삭제
다국어입력
즐겨찾기0
KIBIM Magazine 12권 2호.jpg
KCI등재후보 학술저널

BIM기반 에너지절약계획서 건축부문 부분자동화 작성 시스템 제안

A Proposal for Partial Automation Preparation System of BIM-based Energy Conservation Plan: Case Study on Automation Process Using BIM Software and Excel VBA

DOI : 10.13161/kibim.2022.12.2.049
  • 66

The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m² or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.

1. 서 론

2. 에너지절약계획서 제도 및 현황 조사

3. Dynamo와 Excel을 이용한 에너지절약 계획서 부분 작성 자동화 프로세스 구축

4. 에너지절약계획서 자동화 시스템 개발 관련 논의

5. 결론

감사의 글

References

로딩중