BIM was introduced under the leadership of public institutions, and projects such as road, railway, and site creation, including BIM tasks, are currently being ordered. In addition, as the Ministry of Land, Infrastructure and Transport(MOLIT) is pushing for the full design of BIM, public institutions under its jurisdiction are also pushing for the full design of BIM. Full design of BIM means that all designs are done with BIM. Public institutions' BIM guidelines only require BIM deliverables, and there is a limited direction for the BIM design process to respond to traditional design approaches. Therefore, it is necessary to develop a BIM-based design process corresponding to the full design of BIM.
1. 서 론
2. 이론적 고찰
3. 직광영향검토 설계 기준 및 사례 분석
4. 직광영향검토 Dynamo 알고리즘 개발
5. 결론
감사의 글
References