상세검색
최근 검색어 전체 삭제
다국어입력
즐겨찾기0
학술저널

Remnant VP Movement Creates a Gap in Pseudogapping Constructions

Remnant VP Movement Creates a Gap in Pseudogapping Constructions

  • 20
022396.jpg

1. Introduction 2. Background on the placement of the gap in Pseudogapping constructions 3. Locating the gap in Pseudogapping constructions 4. The proposed analysis 5. Conclusion References

(0)

(0)

로딩중