A recently developed alternative to traditional production planning and control systems such as material requirement planning(MRP) and just-in-time(JIT) is the drum-buffer-rope(DBR). The DBR now being implemented in growing number of manufacturing organizations enables better scheduling and decision making on the shop floor. In implementing the DBR, however, an information system is usually needed to transmit the signal that runs from the constraint to material release. In this paper we propose a different mechanism to transmit the signal in the case that the demand of product is stable, which uses the well-known Kanban system. To improve the reality, this paper shows and example of the Kanban format, its operation, and calculation of the number of Kanbans.