학술저널
As a basic study to develop heating panel, the purpose of this study was to know possibility as a floor heating panel. We investigated working conditions and performance of pulsating heat pipe. Tests were conducted under the next conditions; Working fluid were R-22 and R-134a, charging ratio 40% and 50%, temperature of inlet water 60℃and 70℃, flow rates 1~3 ㎏/min.<BR> The experimental results indicate that the pulsating heat pipe charged 50% showed better performance than 40%, R-22 is more suited to the working fluid than R-134a, and it has a possibility which can be applied to floor heating panel using a pulsating heat pipe.
ABSTRACT<BR>1. 서론<BR>2. 실험장치 및 방법<BR>3. 실험결과 및 고찰<BR>4. 결론<BR>참고문헌<BR>
(0)
(0)