상세검색
최근 검색어 전체 삭제
다국어입력
즐겨찾기0
국가지식-학술정보

Optimal Number of Failures before Group Replacement under Minimal Repair

  • 0
커버이미지 없음

In this paper, a group replacement policy based on a failure count is analysed. For a group of identical repairable units, a maintenance policy is performed with two phase considerations: a repair interval phase and a waiting interval phase. Each unit undergoes minimal repair at failure during the repair interval. Beyond the interval, no repair is made until a number of failures. The expected cost rate expressions under the policy is derived. A method to obtain the optimal values of decision variables are explored. Numerical examples are given to demonstrate the results.

(0)

(0)

로딩중